The Power of Siberia (Russian: Сила Сибири) pipeline (formerly known as Yakutia–Khabarovsk–Vladivostok pipeline) is a natural gas pipeline under construction in Eastern Siberia to transport Yakutia's gas to Primorsky Krai and Far East countries.
History
On 29 October 2012 president Vladimir Putin instructed the general manager of Gazprom to start the construction of the pipeline. On 21 May 2014, Russia and China signed a 30-years gas deal which was need to make the project feasible. Construction was launched on 1 September 2014 in Yakutsk by president Putin and Chinese deputy premier minister Zhang Gaoli. Construction of the pipeline from Vladivostok to China is expected to start in 2015.Technical description
The pipeline is expected to cost 770 billion roubles and the investment in the gas production is 430 billion roubles. It is expected to be operational by 2019. Capacity of the 56-inch (1,400 mm) pipeline would be up to 61 billion cubic metres per annum (2.2×1012 cu ft/a) of natural gas. 38 billion cubic metres per annum (1.3×1012 cu ft/a) would be supplied to China.Route
The 3,200-kilometre (2,000 mi) pipeline will start from the Chayanda oil and gas field in Yakutia. It will partly run within an integrated corridor with the second stage of Eastern Siberia-Pacific Ocean oil pipeline. In Khabarovsk, it will be connected with the Sakhalin–Khabarovsk–Vladivostok pipeline. Together, these pipelines will feed a planned LNG plant, which will produce liquefied natural gas for the export to Japan, and a planned petrochemical complex in Primorsky Krai. Branches toward Northern China are envisaged.
No comments:
Post a Comment