"Stroygasmontazh" performed the works for the construction of the Dzhubga – Lazarevskoe – Sochi gas
pipeline with a length of over 170 km under the Government Program of
construction of the Olympic facilities and development of the city as a
mountain climate resort.
transgaz-Kuban .»
Showing posts with label StroyGazMontazh Reports. Show all posts
Showing posts with label StroyGazMontazh Reports. Show all posts
Tuesday, 4 November 2014
The Saimaa crossing
«Stroygasmontazh» has completed the construction of an underground crossing under the Saimaa channel at the Gryazovets — Vyborg gas pipeline. The work was conducted in difficult geological conditions, using special equipment.
Ecologically safe option
|
Start up site
|
Drilling rate is 6 m per day
|
Tunneling shield at the exit of the tunnel
|
The first of five strings are fed into the tunnel
|
Ground way
|
Vadim Khodosov, Deputy Director General, LLC “Tonnelniy otryad-4”
— The construction of the crossing across the Saimaa Channel was quite a difficult task, since nobody in the world had ever done suchmicro-tunnels in the rock. It is not surprising that we had to enter changes to the project three times. Moreover, in the course of works there were a number ofoff-nominal situations. For example, at the time of passing the entry pit at the depth of 13 meters, we came upon a quicksand, and when we reached the rock, it turned out that we could not avoid blasting works here as well. Nevertheless, all the difficulties were overcome, and the tunnel was completed.
In my opinion, it was possible thanks to the coherent cooperation of all the parties involved. We met understanding, support of our position in the resolution of any issues: financial, technical decisions, construction deadlines. Everybody helped us in LLC «SGM», from Anatoly Evseev, Yaroslav Soga, Victor Kolesnik to Alexander Tarasov, as well as in OJSC «Krasnodargazstroy», here it is worth noting Andrey Andreev and Nikolay Bulatov. It’s nice to know, that people have a sense of responsibility when working with contractors.
Now we are preparing to work on the second phase of the pipeline. Five moremicro-tunnels are to be built, including crossings under the rivers Sheksna (of 700–800 m), Volkhov (980 m, it is near Kirishi town), and under the Neva and the Saimaa Channel. So in order to cross the Volkhov, we will need a new shield, able to work on the limestone rocks. Right now, together with the German company Herrenknecht AG, we are manufacturing it and hope that by the end of this year it will be ready.
Sakhalin – Khabarovsk – Vladivostok
The construction of the first phase of commissioning of the large-scale gas pipeline system Sakhalin — Khabarovsk — Vladivostok has
been completed. Its commissioning will provide gas to consumers
in Eastern Siberia and the Far East, where until now the level
of gasification has not exceeded 7%. The SGM Group of Companies, engaged
in the construction, laid a total of 40% of the pipeline route.
Asia-Pacific Region. The resource base of the GTS
is the deposits of the Sakhalin shelf. The Employer of construction
is LLC «Gazprom invest Vostok.»
The first phase of the gas pipeline with the capacity of 6 bln. m3 of gas per year will be commissioned in September 2011. It envisages the construction of 1350 km of the linear part and the main compressor station (CS) with the capacity of 32 MW in the north of Sakhalin.
About the Project
The construction of the GTS Sakhalin — Khabarovsk — Vladivostok is provided under the Eastern Gas Program and is designed to improve the gas supply of Khabarovsk, Primorye Territory, the Jewish Autonomous Region and the Sakhalin Region, as well as to direct gas for export to the countries of theThe first phase of the gas pipeline with the capacity of 6 bln. m3 of gas per year will be commissioned in September 2011. It envisages the construction of 1350 km of the linear part and the main compressor station (CS) with the capacity of 32 MW in the north of Sakhalin.
Lengazspetsstroy on guard Yamal
For OJSC «LGSS», performing the general contractor’s works on the construction of the
170-kilometer
section of Bovanenkovo — Ukhta trunk gas pipeline and the northernmost
in the world CS Baidaratskaya, the work on the Yamal Peninsula is not
merely a construction, but also a unique experience for the conservation
and reproduction of the unique natural resources of the Far North.
Employer — CJSC «Yamalgazinvest».
Investor — OJSC «Gazprom».
Commissioning time of the 1st string of the linear part — Q3 of 2012.
About project
OJSC «Lengazspetsstroy» is involved in the construction of the system of Bovanenkovo — Ukhta trunk gas pipelines, designed to ensure gas supply from the Yamal Peninsula to the Northwestern part of Russia and then to the European consumers.Employer — CJSC «Yamalgazinvest».
Investor — OJSC «Gazprom».
Commissioning time of the 1st string of the linear part — Q3 of 2012.
First in Russia
This summer, Vladivostok OJSC “Spetsgazremstroy” is preparing
to complete construction of the first gas pipeline which will pass
through the Bosphor Strait on the East’s unique underwater crossing.
In the autumn of the pipeline will supply gas to consumers Russky
island, where a year Russia will have to receive guests and participants
of the 24th APEC summit.
TEC-2 on the mainland and the island was
virtually complete. On the underwater passage through the Bosphor from
6.39 km East pipes were laid 2.8 km main line and 0.41 km reserve.
Customer advocates the construction of “Gazpromregiongaz”, the general
contractor — JSC “Spetsgazremstroy.”
Information
At the beginning of June 2011 the construction of inter-settlement gas pipeline from the GDS to Vladivostok on. Russian with a branch to