Gas resources exploration and gas transmission system formation in Eastern Russia |
The Yakutia – Khabarovsk – Vladivostok gas trunkline will be constructed at the first stage, and at the second stage the Irkutsk center will be connected to the Yakutia center by the gas pipeline.
The GTS route will run in parallel with the Eastern Siberia – Pacific Ocean operational oil pipeline, thus enabling to streamline the infrastructure and power supply costs. The GTS route will pass, inter alia, through swampy, mountainous and seismically hazardous areas.
The bulk of pipes used in the construction will be domestically manufactured. Some 11,700 experts will be engaged within Phase 1 of the Power of Siberia project and some 3,000 employees will ensure the pipeline's operation.
The GTS received its name following the contest results