STROYGAZMONTAZH” is the largest company in Russia that performs construction of above ground facilities of oil and gas infrastructure, at the moment it realizes almost one half of all the construction projects related to compressor stations for the gas pipelines of the country
Construction of seven compressor stations is envisaged as part of the first start-up facility to ensure transportation of gas through Gryazovets – Vyborg gas pipeline. LLC “SGM” is the general contractor in the construction of six of them: Gryazovetskaya,Volkhovskaya, Sheksninskaya, Babaevskaya,Pikalevskaya and Elizavetinskaya compressor stations
Gryazovetskaya, Babaevskaya,Volkhovskaya and Elizavetins kaya compressor stations are to be commissioned already in 2011. All compressor stations will be equipped with modern high performance gas compressor units with a unit capacity of 16 and 25 MW.
LLC “SGM” also became the general contractor in the project of “Reconstruction of pilot-production compressor station at CS Gryazovetskaya where a new gas compressor unit GCU-32 Ladoga made in Russia with a capacity of 32 MW was installed. It is characterized by high for the Russian stationary gas compressor units coefficient of efficiency (36%), low emission level and significant operational life
At Pochinki – Yaroslavl section of Pochinki – Gryazovets gas pipeline LLC “STROYGAZMONTAZH” is constructing CS 04 Ivanovskaya and CS 03 Vyaznikovskaya
“STROYGAZMONTAZH” also became the general contractor for construction of the main compressor station Sakhalin for Sakhalin – Khabarovsk – Vladivostok trunk gas pipeline as well as for construction of two bases of linear production administration in Komsomolsk-on-Amurand in Khabarovsk
Moreover, LLC “SGM” is constructing CS-6 Intinskaya and CS-7 Syninskaya at Bovanenkovo – Ukhta system of trunk gas pipelines
In 2011, “STROYGAZMONTAZH” went ahead with construction of another three stations: Novoprivodinskaya, Novonyuksenitskaya and Novoyubileynaya on Ukhta – Torzhok gas pipeline.