Dzhubga – Lazarevskoe – Sochi

"Stroygasmontazh" performed the works for the construction of the Dzhubga – Lazarevskoe – Sochi gas pipeline with a length of over 170 km under the Government Program of construction of the Olympic facilities and development of the city as a mountain climate resort.
Commencement of the gas pipeline construction
Commencement of the gas pipeline construction
Arrangement of crossings using the HDD method
Arrangement of crossings using the HDD method
GSP vessel spread
GSP vessel spread
The pipe laying vessel arrived from Dubai
The pipe laying vessel arrived from Dubai
Delivery of pipes on C-Master
Delivery of pipes on C-Master
Shooting of a film “Nobody and never”
Shooting of a film “Nobody and never”
The initial stage of welding
The initial stage of welding
Petrovich
Petrovich
On the conveyer
On the conveyer
The pipe is laid down in the sea
The pipe is laid down in the sea
Remotely operated vehicle
Remotely operated vehicle
The first tie-in
The first tie-in

About the Project

The Dzhubga — Lazarevskoe — Sochi gas pipeline runs on the bottom of the Black Sea along the coastal line at a distance of 4.5 km from the coast. Its diameter is 530 mm, the annual capacity is 3.8 bln. m і. The estimated service life is 50 years. Its Employer is LLC «Peter Gaz». The operating organization is LLC «Gazprom transgaz-Kuban