Wednesday, 12 November 2014

Route of Power of Siberia

The 3,200-kilometre (2,000 mi) pipeline will start from the Chayanda oil and gas field in Yakutia. It will partly run within an integrated corridor with the second stage of Eastern Siberia-Pacific Ocean oil pipeline.[8] In Khabarovsk, it will be connected with the Sakhalin–Khabarovsk–Vladivostok pipeline. Together, these pipelines will feed a planned LNG plant, which will produce liquefied natural gas for the export to Japan, and a planned petrochemical complex in Primorsky Krai.[8][9][10] Branches toward Northern China are envisaged.

In addition, the project includes 800-kilometre (500 mi) pipeline from Irkutsk to Yakutia.

No comments:

Post a Comment