The pipeline will be fed from the Chayanda oil and gas field in Yakutia.
[11] The gas field is expected to be launched in 2019.
[5] Later the Kovykta field, which would come operational by 2021, will be connected to the pipeline.
[5][12] Independent producers may supply up to 25 billion cubic metres per annum (880
×109 cu ft/a) of natural gas.
[13]
No comments:
Post a Comment