Wednesday, 12 November 2014

Source of supply of Power of Siberia,

The pipeline will be fed from the Chayanda oil and gas field in Yakutia.[11] The gas field is expected to be launched in 2019.[5] Later the Kovykta field, which would come operational by 2021, will be connected to the pipeline.[5][12] Independent producers may supply up to 25 billion cubic metres per annum (880×109 cu ft/a) of natural gas.[13]

No comments:

Post a Comment