Employer: ZAO “Yamalgazinvest"
Total length: 80 kmPipe diameter: 720 mm
Pressure: 5.4 MPa
LLC «STROYGAZMONTAZH» carries out 2nd string of Urengoy — Surgut
condensate pipeline construction that allows to increase its capacity
from 9.5 to 12 million tons of fuel per year.
Scope of work includes the construction of80-km-long
linear condensate pipeline portion at 508 km — 588 km segment within
Surgut District (KhMAO), moreover the construction of pig launching
station area and two process connecting pipes.
The most part of the condensate pipeline is laying down across swampy andwater-flooded
area and for this reason the main scope of construction works
is carried out in autumn and winter seasons when the ground is frozen.
Scope of work includes the construction of
The most part of the condensate pipeline is laying down across swampy and